Does anyone know what PG&E is planning?
http://www.fool.com/investing/general/2015/10/17/california-hits-brakes-electric-vehicle-infrastruc.aspx
If it's DCFC (hopefully CCS), even 1000 additional would be useful. But L2 is pretty useless as I see most L2 chargers not being used even today. At proposed price point, "$654 million proposal to regulators to add 25,100 electric-vehicle charging stations", each station works out to $26055, kind of low to be DCFC, way too high for L2. But with wiring, etc, maybe these are all L2? If L2, even the 1/10 of that is way too many.
Better would be to have 1/10 as DCFC. Anyone know how to muscle PG&E? ;-)
http://www.fool.com/investing/general/2015/10/17/california-hits-brakes-electric-vehicle-infrastruc.aspx
If it's DCFC (hopefully CCS), even 1000 additional would be useful. But L2 is pretty useless as I see most L2 chargers not being used even today. At proposed price point, "$654 million proposal to regulators to add 25,100 electric-vehicle charging stations", each station works out to $26055, kind of low to be DCFC, way too high for L2. But with wiring, etc, maybe these are all L2? If L2, even the 1/10 of that is way too many.
Better would be to have 1/10 as DCFC. Anyone know how to muscle PG&E? ;-)